正在加载图片...
ICAL 1- Date of opening (all dates in 2005) CAL 2- Date of beginning of action 3.- Date foreseen for validation DEM follow-up issue. Integral Corrective Action List 4- Date of validation(closing) Pa Solutions / Action Who P 3 Gate(mold flow) Waiting for confirmation. 28/0 . pArting line Waiting for confirmation P5 Slider aiting for confirmation 280928 Draft angle Waiting for confirmation 280928/092809ICAL ICAL 1 - Date of opening (all dates in 2005) 2 - Date of beginning of action 3.- Date foreseen for validation DFM follow-up issue. Integral Corrective Action List 4 – Date of validation (closing) Page Open points Solutions / Action Who 1 2 3 4 P.3 Gate (mold flow) Waiting for confirmation. 28/09 28/09 28/09 P.4 Parting line Waiting for confirmation. 28/09 28/09 28/09 P.5 Slider Waiting for confirmation. 28/09 28/09 28/09 P.6 Draft angle Waiting for confirmation 28/09 28/09 28/09
<<向上翻页向下翻页>>
©2008-现在 cucdc.com 高等教育资讯网 版权所有