正在加载图片...
AF7 Installation instructions Cavity Side Installation STEP 5: Lift the ejector half of the adapter frame with STEP 1: Install the cavity side adapter frame in the the standard mold base installed using a MUD molding machine, using clamps or bolting directly balanced lifting bar. Slide the standard mold base through the clamp plate of the frame. The cavity and ejector half adapter frame into the cavity half side adapter frame is aligned by the locating ring adapter frame already installed in the machine (Step 1) Rotate the adapter frame to a vertical position by using a level on the inside of the ear plate STEP 6: Close the machine to clamp the mold etainer rail. Be sure the mounting bolts or halves together clamps are tight. STEP 7: Clamp the standard mold base adapter frame STEP 2: Determine that the adapter frame companion ear ejector half to the machine platen plates are mounted on the standard mold base as detailed in the ear plate installation instructions. STEP 8: To remove the ear plate equipped standard mold m Ejector Side Installation ear plate hold down clamps located on the tops STEP 3: With the ear plates installed on the standard mold of the adapter frame rails. Then open the base, slide it into the ejector side of the adapter machine approximately 1/16"to 3/16 frame prior to installation in the molding machine Now clamp the standard mold base in the STEP 9: If bolts are to be used through the adapter frame adapter frame using the clamps on the end of the clamp plate, remove the standard mold base from the frame and install the bolts STEP 4: Measure the total shut height of the ear plates STEP 10: If the adapter frame is bolted through the clamp standard mold base and adapter frame. adjust plate to the platen, the clamps (Step 7)can now the machine platens open an additional 1/16 to 3/16 to allow the assembly to slide between the platens and into the cavity side of the STEP 11: THE MUD Quick-Change adapter frame is now adapter frame ready to accept an unlimited number of standard mold bases ed with companion ear plates U.S.8oo626-6653m net MASTER Canada 800-387-6600 Europe 32-15-215011 UNIT DEU.S. 800-626-6653 ■ www.dme.net Canada 800-387-6600 ■ Europe 32-15-215011 AF 7 Cavity Side Installation STEP 1: Install the cavity side adapter frame in the molding machine, using clamps or bolting directly through the clamp plate of the frame. The cavity side adapter frame is aligned by the locating ring. Rotate the adapter frame to a vertical position by using a level on the inside of the ear plate retainer rail. Be sure the mounting bolts or clamps are tight. STEP 2: Determine that the adapter frame companion ear plates are mounted on the standard mold base as detailed in the ear plate installation instructions. Ejector Side Installation STEP 3: With the ear plates installed on the standard mold base, slide it into the ejector side of the adapter frame prior to installation in the molding machine. Now clamp the standard mold base in the adapter frame using the clamps on the end of the frame. STEP 4: Measure the total shut height of the ear plates, standard mold base and adapter frame. Adjust the machine platens open an additional 1/16" to 3/16" to allow the assembly to slide between the platens and into the cavity side of the adapter frame. STEP 5: Lift the ejector half of the adapter frame with the standard mold base installed using a MUD balanced lifting bar. Slide the standard mold base and ejector half adapter frame into the cavity half adapter frame already installed in the machine (Step 1). STEP 6: Close the machine to clamp the mold halves together. STEP 7: Clamp the standard mold base adapter frame ejector half to the machine platen. STEP 8: To remove the ear plate equipped standard mold base from the adapter frame, unclamp the four (4) ear plate hold down clamps located on the tops of the adapter frame rails. Then open the machine approximately 1/16" to 3/16". STEP 9: If bolts are to be used through the adapter frame clamp plate, remove the standard mold base from the frame and install the bolts. STEP 10: If the adapter frame is bolted through the clamp plate to the platen, the clamps (Step 7) can now be removed. STEP 11: THE MUD Quick-Change adapter frame is now ready to accept an unlimited number of standard mold bases equipped with companion ear plates. Installation instructions MUD_adapter_rev1 11/3/05 3:15 PM Page 7
<<向上翻页向下翻页>>
©2008-现在 cucdc.com 高等教育资讯网 版权所有