WACC Assumptions The risk of the project is identical to the risk of the firms existing assets The project will be financed in the same way(same D: E)as the firm as a wholeWACC Assumptions • The risk of the project is identical to the risk of the firm’s existing assets. • The project will be financed in the same way (same D:E) as the firm as a whole