正在加载图片...
Auditor's Recommendations Look At: Look For. Floor desig Wall and fioor joints are coved to prevent innaccessible cleaning and harbourage of pests 1.5.6 Damaged flooring must be repaired as quickly as possible with materials compatible with the original flooring and in a permanent fashion. Temporary measures must be rectified with an action plan in specified time. Auditor's Recommendations Look At: Look For: Floor Maintenance Inspection and maintenance of floor undertaken Schedule On identification suitably adequate methods of control are actioned and original flooring scheduled for rep: Completion of relevant maintenance documents to prove undertaking 1.5.7 Where mezzanine floors are adopted they should be completely sealed and include side walls of adequate height. Drainage within these floors should be completely self contained and there must be no risk of contamination of machinery or products sited below Auditor's Recommendations. Look At Look For 1.5.8 Any stairways to or from mezzanine foors or gangways over production lines must be sealed and include side walls to prevent product conta 1.6 Condition of walls, doors and windows 1.6.1 All interior walls in rooms where open food is stored or processed must be in good condition and finished with a hygienic, easy to clean surface, which does not pose a foreign body hazard e.g. walls should be finished with a continuous, bonded surface and protected from damage. Corners, joints between cladding sheets or ceramic tiles must be sealed with a suitable impervious sealant Auditor's Recommendations: Look At Look For Interior Walls Hygienic and Food Grade Material Protection for wall cladding against damage Food grade impervious sealant used to seal joints Cleaning records Easy to clean with suitable cleaning records to supportAuditor’s Recommendations: Look At: Look For: Floor design Wall and floor ‘joints’ are coved to prevent innaccessible cleaning and harbourage of pests 1.5.6 Damaged flooring must be repaired as quickly as possible with materials compatible with the original flooring and in a permanent fashion. Temporary measures must be rectified with an action plan in a specified time. Auditor’s Recommendations: Look At: Look For: Floor Maintenance Schedule Inspection and maintenance of floor undertaken. On identification suitably adequate methods of control are actioned and original flooring scheduled for repair. Completion of relevant maintenance documents to prove undertaking 1.5.7 Where mezzanine floors are adopted, they should be completely sealed and include side walls of adequate height. Drainage within these floors should be completely self contained and there must be no risk of contamination of machinery or products sited below. Auditor’s Recommendations: Look At: Look For: 1.5.8 Any stairways to or from mezzanine floors or gangways over production lines must be sealed and include side walls to prevent product contamination. 1.6 Condition of walls, doors and windows 1.6.1 All interior walls in rooms where open food is stored or processed must be in good condition and finished with a hygienic, easy to clean surface, which does not pose a foreign body hazard e.g. walls should be finished with a continuous, bonded surface and protected from damage. Corners, joints between cladding sheets or ceramic tiles must be sealed with a suitable impervious sealant. Auditor’s Recommendations: Look At: Look For: Interior Walls Hygienic and Food Grade Material No decomposition Protection for wall cladding against damage Food grade impervious sealant used to seal joints Cleaning records Easy to clean with suitable cleaning records to support
<<向上翻页向下翻页>>
©2008-现在 cucdc.com 高等教育资讯网 版权所有