Chapter 18 NETWORK DESIGN AND IMPLEMENTATION J33 6 SELECTION OF EQUIPMENT ANDⅤ ENDORS Formal approach RFP: request for proposal rep document contains a detailed description of the requirements, including timing requirements and constraints限制,and Roberts engineer; often asks the vendors to formally respond with referred to as the father of the a proposal by a certain date ARPANET www.gxmu.edu.cn18.6 SELECTION OF EQUIPMENT AND VENDORS Formal approach: RFP:request for proposal RFP document contains a detailed description of the requirements, including timing requirements and constraints限制, and asks the vendors to formally respond with a proposal by a certain date. www.gxmu.edu.cn Roberts, engineer; often referred to as "the father of the ARPANET"; Chapter 18 NETWORK DESIGN AND IMPLEMENTATION