正在加载图片...
drainage is particularly important for ravine landfills where a significant watershed may drain through the site. In addition, drainage of the landfill area itself must be modified to route water away from the initial fill area. Other site preparation tasks include construction of access roads and weighing facilities, and installation of fenc The next step in the development of a landfill is the excavation and preparation of the landfill bottom only a small part of the unprotected landfill surface to be exposed to precipitation at any time. In addition, excavations are carried out over time, rather than preparing the entire landfill bottom at once. Excavated material can be stockpiled on unexcavated soil near the active area and the problem of precipitation collecting in the excavation is minimized. Where the entire bottom of the landfill is lined at once, provision must be made to remove storm-water runoff from the portion of the landfill that is not To minimize costs, it is desirable to obtain cover materials from the landfill site whenever possible. The initial working area of the landfill is excavated to the design depth, and the excavated material stockpiled or later use. Vadose zone(zone between ground surface and permanent groundwater) and groundwater monitoring equipment is installed before the landfill liner is laid down. The landfill bottom is shaped to provide drainage of leachate, and a low-permeability liner is installed. Leachate collection and extraction facilities are placed within or on top of the liner. Typically, the liner extends up the excavated walls of the landfill. Horizontal gas recovery trenches may be installed at the bottom of the landfill, particularly if emissions of volatile organic compounds(vOCs) from the newly placed waste is expected to be a problem. To minimize the release of VOCs. a vacuum is applied and air is drawn through the completed portions of the landfill. The gas that is removed must be burned under controlled conditions to destroy the VOCs. Before the fill operation begins, a soil berm is constructed at the downwind side of the planned fill area. The berm serves as a windbreak to control blowing materials and as a face agains which the waste can be compacted. For excavated landfills, the wall of the excavation usually serves as the initial compaction face The placement of wastes. Once the landfill site has been prepared, the next step in the process involves the actual placement of waste material. The waste is placed in cells beginning along the compaction face. continuing outward and upward from the face. The waste deposited in each operating period, usually one day, forms an individual cell. Wastes deposited by the collection and transfer vehicles are spread out in 18-to 215-in layers and compacted. Typical cell heights vary from 8 to 12 ft. The length of the working face varies with the site conditions and the size of the operation. The working face is the area of a landfill where solid waste is being unloaded, placed and compacted during a given operating period. The width of a cell varies from 10 to 30 ft, again depending on the design and capacity of the landfill. All exposed faces of the cell are covered with a thin layer of soil (6 to 12 in) or other suitable material at the end of each operating period After one or more lifts have been placed, horizontal gas recovery trenches can be excavated in the completed surface. The excavated trenches are filled with gravel, and perforated plastic pipes are installed in the trenches. Landfill gas is extracted through the pipes as the gas is produced. Successive lifts are placed on top of one another until the final design grade is reached. Depending on the depth of the landfill, additional leachate collection facilities may be placed in successive lifts. A cover layer is applied to the completed landfill section. The final cover is designed to minimize infiltration of precipitation and to route drainage away from the active section of the landfill. The cover is landscaped to control erosion. Vertical gas extraction wells may be installed at this time through the completed landfill surface. The gas extraction system is tied together and the extracted gas may be flared or routed to energy recovery facilities as appropriate Additional sections of the landfill are constructed outward from the co leted sections, repeating the construction steps outlined above. As organic materials deposited the landfill decompose completed sections may settle. Landfill construction activities must include refilling and repairing of settled landfill surfaces to maintain the desired final grade and drainage. The gas and leachate control systems al so must be extended and maintained. Upon completion of all fill activities, the landfill surface is repaired and upgraded with the installation of a final cover. The site is landscaped appropriately and prepared for other uses Postclosure management. Monitoring and maintenance of the completed landfill must continue by law for some time after closure(30 to 50 vears). It is particularly important that the landfill surface be3 drainage is particularly important for ravine landfills where a significant watershed may drain through the site. In addition, drainage of the landfill area itself must be modified to route water away from the initial fill area. Other site preparation tasks include construction of access roads and weighing facilities, and installation of fences. The next step in the development of a landfill is the excavation and preparation of the landfill bottom and subsurface sides. Modern landfills typically are constructed in sections. Working by sections allows only a small part of the unprotected landfill surface to be exposed to precipitation at any time. In addition, excavations are carried out over time, rather than preparing the entire landfill bottom at once. Excavated material can be stockpiled on unexcavated soil near the active area and the problem of precipitation collecting in the excavation is minimized. Where the entire bottom of the landfill is lined at once, provision must be made to remove storm-water runoff from the portion of the landfill that is not being used. To minimize costs, it is desirable to obtain cover materials from the landfill site whenever possible. The initial working area of the landfill is excavated to the design depth, and the excavated material stockpiled for later use. Vadose zone (zone between ground surface and permanent groundwater) and groundwater monitoring equipment is installed before the landfill liner is laid down. The landfill bottom is shaped to provide drainage of leachate, and a low-permeability liner is installed. Leachate collection and extraction facilities are placed within or on top of the liner. Typically, the liner extends up the excavated walls of the landfill. Horizontal gas recovery trenches may be installed at the bottom of the landfill, particularly if emissions of volatile organic compounds (VOCs) from the newly placed waste is expected to be a problem. To minimize the release of VOCs. a vacuum is applied and air is drawn through the completed portions of the landfill. The gas that is removed must be burned under controlled conditions to destroy the VOCs. Before the fill operation begins, a soil berm is constructed at the downwind side of the planned fill area. The berm serves as a windbreak to control blowing materials and as a face against which the waste can be compacted. For excavated landfills, the wall of the excavation usually serves as the initial compaction face. The placement of wastes. Once the landfill site has been prepared, the next step in the process involves the actual placement of waste material. The waste is placed in cells beginning along the compaction face, continuing outward and upward from the face. The waste deposited in each operating period, usually one day, forms an individual cell. Wastes deposited by the collection and transfer vehicles are spread out in 18- to 215-in layers and compacted. Typical cell heights vary from 8 to 12 ft. The length of the working face varies with the site conditions and the size of the operation. The working face is the area of a landfill where solid waste is being unloaded, placed and compacted during a given operating period. The width of a cell varies from 10 to 30 ft, again depending on the design and capacity of the landfill. All exposed faces of the cell are covered with a thin layer of soil (6 to 12 in) or other suitable material at the end of each operating period. After one or more lifts have been placed, horizontal gas recovery trenches can be excavated in the completed surface. The excavated trenches are filled with gravel, and perforated plastic pipes are installed in the trenches. Landfill gas is extracted through the pipes as the gas is produced. Successive lifts are placed on top of one another until the final design grade is reached. Depending on the depth of the landfill, additional leachate collection facilities may be placed in successive lifts. A cover layer is applied to the completed landfill section. The final cover is designed to minimize infiltration of precipitation and to route drainage away from the active section of the landfill. The cover is landscaped to control erosion. Vertical gas extraction wells may be installed at this time through the completed landfill surface. The gas extraction system is tied together and the extracted gas may be flared or routed to energy recovery facilities as appropriate. Additional sections of the landfill are constructed outward from the completed sections, repeating the construction steps outlined above. As organic materials deposited within the landfill decompose, completed sections may settle. Landfill construction activities must include refilling and repairing of settled landfill surfaces to maintain the desired final grade and drainage. The gas and leachate control systems also must be extended and maintained. Upon completion of all fill activities, the landfill surface is repaired and upgraded with the installation of a final cover. The site is landscaped appropriately and prepared for other uses. Postclosure management. Monitoring and maintenance of the completed landfill must continue by law for some time after closure (30 to 50 years). It is particularly important that the landfill surface be
<<向上翻页向下翻页>>
©2008-现在 cucdc.com 高等教育资讯网 版权所有