Preconditions of Kanban Product Demand Output/day Takt Time (min) A 400 16 26.2 B 300 12 35 C 200 6 52.5 D 100 4 105 Sum 1000 40 10.5 Mix 1:A:400-B:300-C:200-D:100,cycle only once per month; Mix 2:A:100-B:75-C:50-D:25,cycle 4 times per month; Mix 3:A:4-B:3-C:2-D:1,cycle 100 times per month; Mix 4:ABCABCABAD,A cycle 400 time per month,B 300 time per month,C 200 times per month,and D 100 times per month. 上泽充道大姿Preconditions of Kanban • Mix 1: A: 400-B:300-C:200-D:100, cycle only once per month; • Mix 2: A:100-B:75-C:50-D:25, cycle 4 times per month; • Mix 3: A:4-B:3-C:2-D:1, cycle 100 times per month; • Mix 4: ABCABCABAD, A cycle 400 time per month, B 300 time per month, C 200 times per month, and D 100 times per month. Product Demand Output/day Takt Time (min) A 400 16 26.2 B 300 12 35 C 200 8 52.5 D 100 4 105 Sum 1000 40 10.5