(oPening of bids and award of bid (4 )Win the bid and sign the contract When concluding the contract, the winning bidder is usually required to pay the performance bond◼ (3) Opening of bids and award of bid ◼ (4) Win the bid and sign the contract • When concluding the contract, the winning bidder is usually required to pay the performance bond