正在加载图片...
高层建筑及附体基础设计 学生姓名:王文良指导教师:刘丽萍 (土木工程学院土木工程专业) 【摘要】:本设计为高层建筑及附体基础设计,主体为24层商住楼,框支剪力墙结构,附体为4层商场 框架结构。主要完成了上部结构竖向导载计算和主楼及附体基础设计。为了减少由于上部结构荷载不均引 起的不均匀沉降,主体采用桩筏基础,刚性板法计算内力:附体采用十字交叉基础,弹性地基梁法计算内 力,并完成了承载力验算及截面设计等一系列工作 【关键词】:竖向导载桩筏基础十字交叉基础承载力验算截面设计 (Abstract]: The building to be designed is a tall building and its additional parts. The main part is a 24storeies residential apartment which is frame-shear wall structure, and the add itional build ing is a 4 stories frame sstructure shopping building. The main parts of this design include the vertical loadscalculation of superstructure and the foundation desigen To minimum the differential sett lement, pile-raft foundation is used in the main structure and crossing foundation in the additional parts. Theelasticfoundation beam method was used to calculate the intend stress of the crossing foundation (Key words]: transimit ofvertical load, pile reft foundation, cross-shapde foundation, bear ing capucity check, section design 1工程概况 某商住楼,地下一层,地上23层(其中地下一层为人防地下室:地上除一、二层为商 业用房外均为住宅)。由主楼和裙房组成,主楼为框支剪力墙结构,裙房为框架结构,建筑 总面积为25665m2 2设计基本资料 建筑物耐久年限为50年;建筑类别为一类;建筑耐火等级为一级;建筑抗震烈度为8 2.1工程地质劫察报告 包括地基地层报告、地下水、不良地质现象、地基土物理力学性质指标。 2.2建筑图 底层平面图;地下一层平面图;剖面图:立面图:标准层平面图。 2.3结构图 标准层结构平面图;一层结构平面图:地下一层结构平面图。 3上部结构竖向导载的计算 基础是将上部结构荷载传向地基的结构,传至基础顶面的荷载是基础设计的依据,因而 需计算出作用于基础顶面的上部结构竖向荷载。要求计算上部结构梁板传至柱或墙的荷载, 并累加到基础顶面。要求恒载标准值和活载标准值分别计算。包括主体结构竖向荷载作用下 内力的计算,附体结构竖向荷载作用下框架结构的内力计算。 4主体基础设计 4.1基础选型高层建筑及附体基础设计 学生姓名:王文良 指导教师:刘丽萍 (土木工程学院 土木工程专业) 【摘 要】: 本设计为高层建筑及附体基础设计,主体为 24 层商住楼,框支剪力墙结构,附体为 4 层商场, 框架结构。主要完成了上部结构竖向导载计算和主楼及附体基础设计。为了减少由于上部结构荷载不均引 起的不均匀沉降,主体采用桩筏基础,刚性板法计算内力;附体采用十字交叉基础,弹性地基梁法计算内 力,并完成了承载力验算及截面设计等一系列工作。 【关键词】:竖向导载 桩筏基础 十字交叉基础 承载力验算 截面设计 【Abstract】: The building to be designed is a tall building and its additional parts.The main part is a 24storeies residential apartment which is frame-shear wall structure,and the additional building is a 4 stories frame sstructure shopping building. The main parts of this design include the vertical loadscalculation of superstructure and the foundation desigen.To minimum the differential settlement,pile-raft foundation is used in the main structure and crossing foundation in the additional parts.Theelasticfoundation beam method was used to calculate the internd stress of the crossing foundation. 【Key words】: transimit ofvertical load, pile reft foundation, cross-shapde foundation, bearing capucity check, section design. 1 工程概况 某商住楼,地下一层,地上 23 层(其中地下一层为人防地下室;地上除一、二层为商 业用房外均为住宅)。由主楼和裙房组成,主楼为框支剪力墙结构,裙房为框架结构,建筑 总面积为 25665m2。 2 设计基本资料 建筑物耐久年限为 50 年;建筑类别为一类;建筑耐火等级为一级;建筑抗震烈度为 8 度。 2.1 工程地质勘察报告 包括地基地层报告、地下水、不良地质现象、地基土物理力学性质指标。 2.2 建筑图 底层平面图;地下一层平面图;剖面图;立面图;标准层平面图。 2.3 结构图 标准层结构平面图;一层结构平面图;地下一层结构平面图。 3 上部结构竖向导载的计算 基础是将上部结构荷载传向地基的结构,传至基础顶面的荷载是基础设计的依据,因而 需计算出作用于基础顶面的上部结构竖向荷载。要求计算上部结构梁板传至柱或墙的荷载, 并累加到基础顶面。要求恒载标准值和活载标准值分别计算。包括主体结构竖向荷载作用下 内力的计算,附体结构竖向荷载作用下框架结构的内力计算。 4 主体基础设计 4.1 基础选型
向下翻页>>
©2008-现在 cucdc.com 高等教育资讯网 版权所有