正在加载图片...
1384 工程科学学报,第43卷,第10期 [11]Xie X Y,Zhao M R,Zhou B,et al.Model experiment study on reinforcement concrete jacking pipe.Special Struct,2010,27(4): stability mechanisms of large rectangular excavation faces under 110 the effect of pipe roof.Chin J Rock Mech Eng,2019,38(11):2299 (徐震.关于顶管用钢筋混凝土管道的竖向土压力计算的探讨. (谢雄耀,赵铭睿,周彪,等.管蒂作用下矩形大断面开挖面稳定 特种结构,2010,27(4):110) 模型试验研究.岩石力学与工程学报,2019,38(11):2299) [22]Peng G.Analysis of surface settlement induced by close parallel [12]Karl T.Theoretical Soil Mechanics.Hoboken:John Wiley Sons, dual-tunnel construction of large section rectangular jacking pipe. Inc,1943 Constr Technol,2017,46(20):70 [13]Peng X J,Mao W,Ge C H.Study of design and calculation (彭刚.大断面矩形顶管近距离双线并行施工引发地表沉降分 method of steel pipe jacking Special Srruct,2007,24(3):16 析.施工技术,2017,46(20):70) (彭夏军,毛炜,葛春辉.钢管顶管设计计算方法的研究.特种结 [23]Li Y S,Yang J S,Zhang K N,et al.Surface subsidence caused by 构,2007,24(3):16) construction of large diameter curved jacking-pipes in pipe-roof [14]Guo WG.Discussion and suggestion on calculation formula of pre-construction method.J Central South Univ Sci Technol,2013. jacking force.Munic Eng Technol,1983,1(1):2 44(11):4687 (郭文赓.关于顶管顶力计算公式的讨论和建议.市政技术, (黎永索,阳军生,张可能,等.弧形密排大直径管群顶管地表沉 1983.1(1):2) 降分析.中南大学学报(自然科学版),2013,44(11):4687) [15]Costa Y D,Zornberg J G,Bueno B S,et al.Failure mechanisms in [24]Yang X,Li Y S.Research of surface settlement for a single arch sand over a deep active trapdoor.J Geotech Geoenviron Eng, long-span subway station using the Pipe-roof Pre-construction 2009,135(11)上:1741 Method.Tunn Undergr Space Technol,2018,72:210 [16]Stein D,Mollers K,BieleckiR.Microtnnelling.Berlin:Emest [25]Zhao Y S,Gao Y T,Song W C.Similarity model test and Sohn,1989 numerical simulation of double parallel-tunnel excavation in hard [17]Handy R L.Anatomy of an error.J Geotech Geoenviron Eng, rock under high ground-stress conditions.Chin J Eng,2017, 2004,130(7):768 39(5):786 [18]Jiang W.Zhao W P,Dong W,et al.Calculation method of (赵宇松,高永涛,宋伟超.高地应力硬岩下双孔并行隧道相似 surrounding earth pressure and jacking force of large cross-section 模型试验及数值模拟.工程科学学报,2017,39(5):786) rectangular pipe jacking.J In Mong Univ Sci Technol,2019. [26]Song W C,Gao Y T,Wu S C,et al.Reasonable spacing of parallel 38(4):375 tunnels based on the complex function theory and D-P yield (姜伟,赵文平,董威,等.大断面矩形顶管周围土压力与顶推力 criterion.Chin J Eng,2016,38(2):291 计算方法.内蒙古科技大学学报,2019,38(4):375) (宋伟超,高永涛,吴顺川,等.基于复变函数理论和D-P屈服准 [19]Zhang H F,Ma B S,Zhou W.Problems with the calculation of 则的并行隧道合理间距.工程科学学报,2016,38(2):291) forces applied to tunnels based on the terzaghi soil arching theory [27]Xiong H X,Xu Q S,Ren H.Investigation on jacking force Mod Tunn Technol,2017,54(2):55 parameters of curved pipe-roofing construction in Gongbei tunnel. (张海丰,马保松,周维.太沙基土拱理论计算隧道受力存在的 Tim Constr,2019,39(Suppl 1):146 问题.现代隧道技术,2017,54(2):55) (熊吴翔,许晴爽,任辉.拱北隧道曲线管幕顶管顶力参数取值 [20]Qin J S,Lu G J.Study on terzaghi loose earth pressure in 研究.隧道建设,2019,39(增刊1):146) tunneling.Constr Technol,2007,36(Suppl 1):390 [28]Li Z H,Li J.A study of the interaction between the pipes of a (秦建设,吕国君.太沙基隧道松动土压力研究.施工技术,2007, curved pipe-roof.Mod Tunn Technol,2015,52(3):63 36(增刊1):390) (李志宏,李剑.曲线顶管管幕管间相互影响研究.现代隧道技 [21]Xu Z.Discussion of vertical soil pressure calculation for 术,2015,52(3):63)Xie  X  Y,  Zhao  M  R,  Zhou  B,  et  al.  Model  experiment  study  on stability  mechanisms  of  large  rectangular  excavation  faces  under the effect of pipe roof. Chin J Rock Mech Eng, 2019, 38(11): 2299 (谢雄耀, 赵铭睿, 周彪, 等. 管幕作用下矩形大断面开挖面稳定 模型试验研究. 岩石力学与工程学报, 2019, 38(11):2299) [11] Karl T. Theoretical Soil Mechanics. Hoboken: John Wiley & Sons, Inc., 1943 [12] Peng  X  J,  Mao  W,  Ge  C  H.  Study  of  design  and  calculation method of steel pipe jacking. Special Struct, 2007, 24(3): 16 (彭夏军, 毛炜, 葛春辉. 钢管顶管设计计算方法的研究. 特种结 构, 2007, 24(3):16) [13] Guo  W  G.  Discussion  and  suggestion  on  calculation  formula  of jacking force. Munic Eng Technol, 1983, 1(1): 2 (郭文赓. 关于顶管顶力计算公式的讨论和建议. 市政技术, 1983, 1(1):2) [14] Costa Y D, Zornberg J G, Bueno B S, et al. Failure mechanisms in sand  over  a  deep  active  trapdoor. J Geotech Geoenviron Eng, 2009, 135(11): 1741 [15] Stein D, Mollers K, BieleckiR. Microtunnelling. Berlin: Emest & Sohn, 1989 [16] Handy  R  L.  Anatomy  of  an  error. J Geotech Geoenviron Eng, 2004, 130(7): 768 [17] Jiang  W,  Zhao  W  P,  Dong  W,  et  al.  Calculation  method  of surrounding earth pressure and jacking force of large cross-section rectangular  pipe  jacking. J Inn Mong Univ Sci Technol,  2019, 38(4): 375 (姜伟, 赵文平, 董威, 等. 大断面矩形顶管周围土压力与顶推力 计算方法. 内蒙古科技大学学报, 2019, 38(4):375) [18] Zhang  H  F,  Ma  B  S,  Zhou  W.  Problems  with  the  calculation  of forces applied to tunnels based on the terzaghi soil arching theory. Mod Tunn Technol, 2017, 54(2): 55 (张海丰, 马保松, 周维. 太沙基土拱理论计算隧道受力存在的 问题. 现代隧道技术, 2017, 54(2):55) [19] Qin  J  S,  Lü  G  J.  Study  on  terzaghi  loose  earth  pressure  in tunneling. Constr Technol, 2007, 36(Suppl 1): 390 (秦建设, 吕国君. 太沙基隧道松动土压力研究. 施工技术, 2007, 36(增刊 1):390) [20] [21] Xu  Z.  Discussion  of  vertical  soil  pressure  calculation  for reinforcement concrete jacking pipe. Special Struct, 2010, 27(4): 110 (徐震. 关于顶管用钢筋混凝土管道的竖向土压力计算的探讨. 特种结构, 2010, 27(4):110) Peng  G.  Analysis  of  surface  settlement  induced  by  close  parallel dual-tunnel construction of large section rectangular jacking pipe. Constr Technol, 2017, 46(20): 70 (彭刚. 大断面矩形顶管近距离双线并行施工引发地表沉降分 析. 施工技术, 2017, 46(20):70) [22] Li Y S, Yang J S, Zhang K N, et al. Surface subsidence caused by construction  of  large  diameter  curved  jacking-pipes  in  pipe-roof pre-construction method. J Central South Univ Sci Technol, 2013, 44(11): 4687 (黎永索, 阳军生, 张可能, 等. 弧形密排大直径管群顶管地表沉 降分析. 中南大学学报(自然科学版), 2013, 44(11):4687) [23] Yang X, Li Y S. Research of surface settlement for a single arch long-span  subway  station  using  the  Pipe-roof  Pre-construction Method. Tunn Undergr Space Technol, 2018, 72: 210 [24] Zhao  Y  S,  Gao  Y  T,  Song  W  C.  Similarity  model  test  and numerical simulation of double parallel-tunnel excavation in hard rock  under  high  ground-stress  conditions. Chin J Eng,  2017, 39(5): 786 (赵宇松, 高永涛, 宋伟超. 高地应力硬岩下双孔并行隧道相似 模型试验及数值模拟. 工程科学学报, 2017, 39(5):786) [25] Song W C, Gao Y T, Wu S C, et al. Reasonable spacing of parallel tunnels  based  on  the  complex  function  theory  and  D−P  yield criterion. Chin J Eng, 2016, 38(2): 291 (宋伟超, 高永涛, 吴顺川, 等. 基于复变函数理论和D−P屈服准 则的并行隧道合理间距. 工程科学学报, 2016, 38(2):291) [26] Xiong  H  X,  Xu  Q  S,  Ren  H.  Investigation  on  jacking  force parameters of curved pipe-roofing construction in Gongbei tunnel. Tunn Constr, 2019, 39(Suppl 1): 146 (熊昊翔, 许晴爽, 任辉. 拱北隧道曲线管幕顶管顶力参数取值 研究. 隧道建设, 2019, 39(增刊 1):146) [27] Li  Z  H,  Li  J.  A  study  of  the  interaction  between  the  pipes  of  a curved pipe-roof. Mod Tunn Technol, 2015, 52(3): 63 (李志宏, 李剑. 曲线顶管管幕管间相互影响研究. 现代隧道技 术, 2015, 52(3):63) [28] · 1384 · 工程科学学报,第 43 卷,第 10 期
<<向上翻页
©2008-现在 cucdc.com 高等教育资讯网 版权所有