Exit Criteria Entry criteria define when to stop testing -At the end of a test level -A set of tests has achieved specific goal ·Include: -Thoroughness measures,such as coverage of code, functionality or risk -Residual risk,such as defects not fixed or lack of test coverage in certain areas -Estimates of defect density or reliability measures Exit Entry -Cost -Schedules such as those based on time to market 同源大学 TONGJI UNIVERSITY SoftwareTesting 15/6/821 Software Testing Exit Criteria 15/6/8 21 • Entry criteria define when to stop testing – At the end of a test level – A set of tests has achieved specific goal • Include: – Thoroughness measures, such as coverage of code, functionality or risk – Residual risk, such as defects not fixed or lack of test coverage in certain areas – Estimates of defect density or reliability measures – Cost – Schedules such as those based on time to market