点击切换搜索课件文库搜索结果(1807)
文档格式:PPT 文档大小:98.5KB 文档页数:14
Lesson Fourteen Requirement By the end of this lesson, you should be able to have a good command of uthe tips of a business plan acommonly-used sentences in writing busi ness plan By the end of this lesson, you should be able to
文档格式:PPT 文档大小:45KB 文档页数:4
1985年,美国研制出第一个推向市场的光盘产品 BiblioFile (LC-arC)数据库及其编目软件系统,它收藏了美国国会 图书馆自1965年以来的全部英语文献书目,以及1900~1964 年的部分书目记录。1986年,我国国家海洋局海洋科技情 报研究所首次引进光盘数据库ASFA(水科学与渔业文摘)。 一、光盘检索的基本特点和过程 二、常用中文光盘数据库检索方法 三、常用西文光盘数据库检索方法与步骤
文档格式:PDF 文档大小:4.22MB 文档页数:108
高等职业技术教育试用教材:汽车专业英语(电子书)
文档格式:DOC 文档大小:553KB 文档页数:23
UNIT 1 HIESTORY OF NUCLEAR POWER UNIT 2 DEMAND FOR ELECTRC POWER UNIT 3 RADIOACITIVITY UNIT 4 NUCLEAR FISSION UNIT 5 GENERAL FEATURES OF NECLEAR REACTORS UNIT 6 REACTOR CONTROL UNIT 7 INSTRUMENTATION UNIT 8 ENERGY REMOVAL UNIT 9 REACTOR MATERIALS UNIT 10 REACTOR SAFETY UNIT 11 QYALITY ASSURANCES UNIT 12 INTRODUCTION TO PWR NPP UNIT 13 REACTOR VESSSEL AND INTERNALS UNIT 14 REACTOR CORE UNIT 15 PRESSURIZER UNIT 16 STEAM GENETATOR UNIT 17 REACTOR COOLANT PUMP
文档格式:DOC 文档大小:232KB 文档页数:6
Structural design After having established the principal dimensions form, and general arrangement of the ship, the designer undertakes the problem of providing a structure capable of withstanding the forces which may be imposed upon it The hull of steel merchant ship is a complex structure, unique in the field of engineering structures in that it is primarily plate structure
文档格式:DOC 文档大小:43.5KB 文档页数:3
The wooden ship was constructed on a building berth, around which timbers ad planking were cut and shaped, and then fitted together on the berth to form the hull. A similar practice was followed with iron vessels and, later, with the earlier was followed with the earlier
文档格式:DOC 文档大小:43.5KB 文档页数:3
The lines plan;fairing A lines plan, usually 1/48 lifesize scale drawing of a ship, is used by designers to calculate required hydrostatic, stability, and capacity conditions. Full-scale drawings formerly were obtained from the lines plan by redrawing it full size and preparing a platform of boards called a \scrive board\showing the length and shape of all frames and beams. Wood tem plates were then
文档格式:DOC 文档大小:38.5KB 文档页数:3
Taking a brand new ship to sea for the first time is naturally quite an event after so many months of preparation and hard work, and the prevailing spirit is one of cheerful optimism, especially if the hopes of good weather have materialized. As soon as the trials party is assembled on board, the pilot, who has probably been waiting in the wheelhouse for some time, orders the gangway
文档格式:DOC 文档大小:174.5KB 文档页数:6
The complete electrical plant on board ship is made up of power generation equipment, a distribution system and the many power utilising devices. Electricity is used for the motor drive of equipment. A constant supply of electricity is essend:lighting ventilation and air conditioning
文档格式:DOC 文档大小:201KB 文档页数:6
The sophistication of modern control systems and the reliability of the equipment used have resulted in machinery spaces remaining unattended for long periods. In order to ensure the safety of the ship and its equipment during UMS operation certain ess certain essential requirements must be met:
首页上页171172173174175176177178下页末页
热门关键字
搜索一下,找到相关课件或文库资源 1807 个  
©2008-现在 cucdc.com 高等教育资讯网 版权所有