点击切换搜索课件文库搜索结果(990)
文档格式:PDF 文档大小:25.35KB 文档页数:4
Handout 18: Dual-input describing functions Eric Feron April 5,2004 Dual-input describing functions are for mixed signals(sinusoid small constant signal) Approximating non-constant signals with constant ones
文档格式:PDF 文档大小:42.18KB 文档页数:4
Handout 13: More about plants with right half-plane zeros Eric Feron March 15, 2004 Right half-plane zeros and sensor/actuator design Influence of sensor position on system dynamics: Star Market
文档格式:PDF 文档大小:156.55KB 文档页数:2
Handout 10: Notch compensation Eric Feron March 8, 2004 Notch Compensation goals: Kill nasty frequencies (eg resonant fre- quencies). Canonical Notch element:
文档格式:PDF 文档大小:290.42KB 文档页数:13
Handout 8: Lead compensation Eric Feron March 3, 2004 Lead Compensation goals: Raise phase (and gain) at high frequen- cies while not touching low-frequency system's characteristics: Can extend bandwidth of system Canonical lead element:
文档格式:PDF 文档大小:206.83KB 文档页数:7
Handout 7: Lag and PI compensation Eric Feron Lag Compensation goals: Raise gain at low frequencies while leaving rossover &z higher frequencies untouched b≥0. When b=0: Add an integrator in the loop Typical lag Bode Plot
文档格式:PDF 文档大小:75.08KB 文档页数:4
Handout 4: Root-Locus Review Eric Feron Feb17,2004 Summary of Guidelines for plotting a root-locus 1. Mark Poles X and Zeros O 2. Draw the locus on the real axis to the left of an odd number of real poles plus zeros
文档格式:PDF 文档大小:209.15KB 文档页数:4
Handout 6: Proportional Compensation Eric Feron Feb25,2004 Plant under study: 1/10 G(s)=(s+1)(s/10+1)2 Compensation Scheme: We adjust the gain K in the feedback loop (draw the feedback loop below)
文档格式:PDF 文档大小:64.75KB 文档页数:8
Handout 2: Gain and Phase margins Eric Feron Feb6,2004 Nyquist plots and Cauchy's principle Let H(s) be a transfer function. eg H(s)= s2+s+1 (s+1)(s+3) Evaluate H on a contour in the s-plane. (your plots here)
文档格式:PPT 文档大小:1.4MB 文档页数:10
第一节城市综合性公园 一、城市公园分类系统 美国城市公园分类系统 德国城市公园分类系统 日本城市公园分类系统 我国城市公园分类系统
文档格式:PDF 文档大小:454.8KB 文档页数:73
项目融资的定义 广义的定义 所有为了建设一个新项目、收购一个现有项目或者对已有项目 进行债务重组所进行的融资活动都可以被称为项目融资 美国财务会计标准手册》(FASB)的定义 是指对需要大规模资金的项目采取的融资活动借款人原则上 将项目本身所拥有的资金及其收益作为还款资金来源,而且将 其项目资产作为抵押条件来处理。该项目事业主体的一般性信 用能力通常不被作为重要因素来考虑
首页上页4647484950515253下页末页
热门关键字
搜索一下,找到相关课件或文库资源 990 个  
©2008-现在 cucdc.com 高等教育资讯网 版权所有