Background SDM split-summer format M Heavily front-loaded Systems perspective Concern with scaling Product development track, CIPD Place in wider context of product realization Joint 16(Aero/Astro)and 2(Mech E) Robust system design
1. Constant Power and Thrust: Prescribed Mission Time Starting with a mass M0 , and operating for a time t an electric thruster of jet speed c, such as to accomplish an equivalent (force-free) velocity change of ∆V , the final