综合搜索课件包文库(990)
文档格式:PPT 文档大小:243.5KB 文档页数:40
Types of Rates Treasury rates(国债利率)—regarded as risk-free rates LIBOR rates (London Interbank Offer rate)(伦敦银行同业放款利率)-generally higher than Treasury zero rates Repo rates(回购利率)—slightly higher than the Treasury rates
文档格式:PDF 文档大小:1.08MB 文档页数:5
对外经济贸易大学:金融工程系《金融经济学导论 Introduction to Financial Economics》课程教学资源(教学大纲)
文档格式:PPT 文档大小:184.5KB 文档页数:32
A Simple Binomial Model of Stock Price Movements In a binomial model, the stock price at the BEGINNING of period can lead to only 2 stock prices at the END of that period
文档格式:PPT 文档大小:323.5KB 文档页数:29
Categorization of Stochastic Processes 1 Discrete time; discrete variable 2 Discrete time; continuous variable 3 Continuous time; discrete variable 4 Continuous time; continuous variable Options, Futures, and Other Derivatives,4 4th edition2000 by John.hull Tang Yincai, 2003, Shanghai Normal University
文档格式:PPT 文档大小:396.5KB 文档页数:41
The Question Being Asked in Value at Risk (VaR) \What loss level is such that we are X% confident it will not be exceeded in N business days?\
文档格式:PPT 文档大小:346.5KB 文档页数:23
Three Alternative Strategies · Take position in: -the option and the underlying -2 or more options of the same type This is known as spread -a mixture of calls and puts This is known as a combination
文档格式:PPT 文档大小:185.5KB 文档页数:45
The Nature of Derivatives derivative(衍生产品/工具) is an instrument whose value depends on the values of other more basic underlying(标的/原 生) variables
文档格式:DOC 文档大小:23.5KB 文档页数:4
为使 建筑安装工程的构想科学,设计和施工经济、合理,建 设速度快,误差小,经甲乙双方充分协商,特订立本合同
文档格式:PPT 文档大小:655.5KB 文档页数:48
为什么要做不确定性分析 很多数据是预测、估算出来的,因此具有不确定性, 在项目真正实施时,相关数据是会有差异的。 一产生不确定性的原因 主观资料不足,分析判断有误差,采用的预测或评价方法 的局限性,测、估算的手段、数据采集方式的变化 客观社会、政治、经济、生产技术、市场的变化 导致技术方案的实践不一定与原来预计的相一致,致 使项目方案的经济评价存在一定程度的不确定性,给方案 决策带来一定的风险
文档格式:PPT 文档大小:1.06MB 文档页数:62
第2章资金的时间价值及等值计算 2.1资金的时间价值 2.2资金等值计算
首页上页4950515253545556下页末页
热门关键字
搜索一下,找到相关课件或文库资源 990 个  
©2008-现在 cucdc.com 高等教育资讯网 版权所有