点击切换搜索课件文库搜索结果(208)
文档格式:PPT 文档大小:627.5KB 文档页数:24
Geothermal's Cost of Capital Weighted Average Cost of Capital (WACc) Capital Structure Required Rates of Return Big Oil's WACC SInterpreting WACC Flotation Costs
文档格式:DOC 文档大小:1.82MB 文档页数:40
1.设曲线L是上半圆周x2+y2=2x,则xdl=π L 解法1由于L关于直线x=1对称,所以∫(x-1)dl=0,从而 L xdl=f[(x-1)+1l=f(x-1)dl+fdl=0+π=π L L L =1+ cost, 解法2令L:y=sint (0≤t≤),则 xdl =Jo (+cost)(-sint)2+(cost)dt=. L 解法3设曲线L的质量分布均匀,则其重心的横坐标为x=1又因为 ∫xdl xdl x= d 1么 π 所以∫xdl=π。 L 2.设L是上半椭圆周x2+4y2=1,y≥0,是四分之一椭圆周 x2+4y2=1,x≥0,y≥0,则 (A)(+ y) (+y) (B) Ixydl =2J, xydl () SLx2dl, y2dl (D)(x+y)2dl =2J (x2+y2) [] 答D
文档格式:PPT 文档大小:322KB 文档页数:19
Measuring the Cost of Living Inflation refers to a situation in which the economy’s overall price level is rising.(通货膨胀指经济的总体 物价水平上涨) The inflation rate is the percentage change in the price level from the previous period
文档格式:DOC 文档大小:21.5KB 文档页数:3
北京大学1998年研究生入学考试:微观经济学试题 一、解释并比较下列经济学基本概念(每题6分,共计30分) 1、私人成本(Private Cost)与社会成本(Social Cost) 2、边际替代率(Marginal Rate of Substitution)与边际技术替代率 (Marginal Rate of Technical Substitution);
文档格式:PPT 文档大小:536KB 文档页数:56
Structure The cost minimization problem Average costs Returns to scale and total and average costs Short run and long run costs
文档格式:PPT 文档大小:179KB 文档页数:29
I. Production Analysis Total Product, Marginal Product, Average Product Isoquants Isocosts Cost Minimization II. Cost Analysis
文档格式:PDF 文档大小:952.83KB 文档页数:20
Capital cost projects begin when a need is defined that cannot be satisfied in existing facilities. Thus begins the life cycle of a capital project (Fig. 1). Once started, the project will progress through all of the following phases or be canceled. It all starts with the recognition of a need that will require capital plant. In the conceptual phase of the project, multiple approaches will be evaluated and one or more plans will be evaluated for meeting these needs
文档格式:PDF 文档大小:165.72KB 文档页数:14
Optimal Routing View routing as\global\ optimization problem Assumptions: The cost of using a link is a function of the flow on that link The total network cost is the sum of the link costs The required traffic rate between each source-destination pair is known in advance Traffic between source-destination pair can be split along multiple paths with infinite precision
文档格式:DOC 文档大小:31KB 文档页数:2
Once a company determines its fixed and variable costs, it can then conduct cost-volume-profit analysis Basically, CVP analysis explores the relationships among costs, volume or activity levels, and profit Break-Even Point One of the primary uses of CVP analysis is to calculate the break-even point. The break-even-point is the number of units
文档格式:PPT 文档大小:132.5KB 文档页数:33
一、引言/Foreword 二、水环境污染损失的核算范围与方法 Valuation contents and approaches of waterpollution cost 三、水污染经济损失计算模型 Valuation model of water pollution cost
上页12345678下页末页
热门关键字
搜索一下,找到相关课件或文库资源 208 个  
©2008-现在 cucdc.com 高等教育资讯网 版权所有