Model Reversion Client Slider qty Model Lifter qty Part name Frame, 2nd drawer Main, MP_2-2 Gate type Pin gate Part no 540634400A Cavities DEM by: WeiYong 2/3 Plate:3 plate
Model Reversion : A Client : Slider qty : 3 Model : Latte-2nd Lifter qty : 0 Part name : Frame,2nd drawer Main,MP_2-2 Gate type : Pin gate Part no.. : 54-06344-00A Cavities : 1 DFM by : WeiYong 2/3 Plate : 3 plate
ICAL I- Date of opening(all dates in 2036) ICAL 2- Date of beginning of action 3- Date foreseen for validation DFM follow-up issue. Integral Corrective Action List 4- Date of validation(closing) Page Open points Solutions /Action Who 2 4 P3 Gate(mold flow) Waiting for confirmation. 08/0908090809 P4 Parting line Waiting for confirmation. 08/0908090809 P5 Parting line Waiting for confirmation. 08/0908090809 P6 Parting line Waiting for confirmation. 080908/090809 .7 S ner Waiting for confirmation 080908090809 P8 Suggestion(others) Waiting for confirmation 08/0908090809 P9 Suggestion(others) Waiting for confirmation 080908090809 P10 Suggestion(others) Waiting for confirmation 08/0908090809 P1l Draft angle Waiting for confirmation 08/0908090809 P12 Draft angle Waiting for confirmation 08/0908090809 P13 Draft angle Waiting for confirmation 08/0908090809 p14 Draft angle Waiting for confirmation 08/0908090809 P15 Draft angle Waiting for confirmation 08/0908090809 P16 Draft angle Waiting for confirmation 08/09080908/09
ICAL ICAL 1 - Date of opening (all dates in 2036) 2 - Date of beginning of action 3.- Date foreseen for validation DFM follow-up issue. Integral Corrective Action List 4 – Date of validation (closing) Page Open points Solutions / Action Who 1 2 3 4 P.3 Gate (mold flow) Waiting for confirmation. 08/09 08/09 08/09 P.4 Parting line Waiting for confirmation. 08/09 08/09 08/09 P.5 Parting line Waiting for confirmation. 08/09 08/09 08/09 P.6 Parting line Waiting for confirmation. 08/09 08/09 08/09 P.7 Slider Waiting for confirmation 08/09 08/09 08/09 P.8 Suggestion (others) Waiting for confirmation 08/09 08/09 08/09 P.9 Suggestion (others) Waiting for confirmation 08/09 08/09 08/09 P.10 Suggestion (others) Waiting for confirmation 08/09 08/09 08/09 P.11 Draft angle Waiting for confirmation 08/09 08/09 08/09 P.12 Draft angle Waiting for confirmation 08/09 08/09 08/09 P.13 Draft angle Waiting for confirmation 08/09 08/09 08/09 P.14 Draft angle Waiting for confirmation 08/09 08/09 08/09 P.15 Draft angle Waiting for confirmation 08/09 08/09 08/09 P.16 Draft angle Waiting for confirmation 08/09 08/09 08/09
Gate(mold flow) 3 0后7 Four pin gate Reale口nm
Gate (mold flow) Four pin gate
Parting line cavity core
Parting line cavity core
Parting line cavIty core
Parting line cavity core
Parting line cav止t core
Parting line cavity core
Slider PLS add slider pins for preventing sticking in slider half
Slider Slider-3 PLS add slider pins for preventing sticking in slider half
Suggestion(others) THIS AREA NEED CUT PLASTIC BE FREE OF SINK MARK
Suggestion (others) THIS AREA NEED CUT PLASTIC BE FREE OF SINK MARK
Suggestion(others) THIS AREANEED CUT PLASTIC BE FREE OF SINK MARK
Suggestion (others) THIS AREA NEED CUT PLASTIC BE FREE OF SINK MARK
Suggestion(others) THIS AREA NEED CUT PLASTIC BE FREE OF SINK MARK
Suggestion (others) THIS AREA NEED CUT PLASTIC BE FREE OF SINK MARK