当前位置:高等教育资讯网  >  中国高校课件下载中心  >  大学文库  >  浏览文档

深圳大学:《塑料成型工艺与模具》课程教学资源(成型方案)Frame 2nd drawer MainMP_2-2

资源类别:文库,文档格式:PPT,文档页数:16,文件大小:4.08MB,团购合买
点击下载完整版文档(PPT)

Model Reversion Client Slider qty Model Lifter qty Part name Frame, 2nd drawer Main, MP_2-2 Gate type Pin gate Part no 540634400A Cavities DEM by: WeiYong 2/3 Plate:3 plate

Model Reversion : A Client : Slider qty : 3 Model : Latte-2nd Lifter qty : 0 Part name : Frame,2nd drawer Main,MP_2-2 Gate type : Pin gate Part no.. : 54-06344-00A Cavities : 1 DFM by : WeiYong 2/3 Plate : 3 plate

ICAL I- Date of opening(all dates in 2036) ICAL 2- Date of beginning of action 3- Date foreseen for validation DFM follow-up issue. Integral Corrective Action List 4- Date of validation(closing) Page Open points Solutions /Action Who 2 4 P3 Gate(mold flow) Waiting for confirmation. 08/0908090809 P4 Parting line Waiting for confirmation. 08/0908090809 P5 Parting line Waiting for confirmation. 08/0908090809 P6 Parting line Waiting for confirmation. 080908/090809 .7 S ner Waiting for confirmation 080908090809 P8 Suggestion(others) Waiting for confirmation 08/0908090809 P9 Suggestion(others) Waiting for confirmation 080908090809 P10 Suggestion(others) Waiting for confirmation 08/0908090809 P1l Draft angle Waiting for confirmation 08/0908090809 P12 Draft angle Waiting for confirmation 08/0908090809 P13 Draft angle Waiting for confirmation 08/0908090809 p14 Draft angle Waiting for confirmation 08/0908090809 P15 Draft angle Waiting for confirmation 08/0908090809 P16 Draft angle Waiting for confirmation 08/09080908/09

ICAL ICAL 1 - Date of opening (all dates in 2036) 2 - Date of beginning of action 3.- Date foreseen for validation DFM follow-up issue. Integral Corrective Action List 4 – Date of validation (closing) Page Open points Solutions / Action Who 1 2 3 4 P.3 Gate (mold flow) Waiting for confirmation. 08/09 08/09 08/09 P.4 Parting line Waiting for confirmation. 08/09 08/09 08/09 P.5 Parting line Waiting for confirmation. 08/09 08/09 08/09 P.6 Parting line Waiting for confirmation. 08/09 08/09 08/09 P.7 Slider Waiting for confirmation 08/09 08/09 08/09 P.8 Suggestion (others) Waiting for confirmation 08/09 08/09 08/09 P.9 Suggestion (others) Waiting for confirmation 08/09 08/09 08/09 P.10 Suggestion (others) Waiting for confirmation 08/09 08/09 08/09 P.11 Draft angle Waiting for confirmation 08/09 08/09 08/09 P.12 Draft angle Waiting for confirmation 08/09 08/09 08/09 P.13 Draft angle Waiting for confirmation 08/09 08/09 08/09 P.14 Draft angle Waiting for confirmation 08/09 08/09 08/09 P.15 Draft angle Waiting for confirmation 08/09 08/09 08/09 P.16 Draft angle Waiting for confirmation 08/09 08/09 08/09

Gate(mold flow) 3 0后7 Four pin gate Reale口nm

Gate (mold flow) Four pin gate

Parting line cavity core

Parting line cavity core

Parting line cavIty core

Parting line cavity core

Parting line cav止t core

Parting line cavity core

Slider PLS add slider pins for preventing sticking in slider half

Slider Slider-3 PLS add slider pins for preventing sticking in slider half

Suggestion(others) THIS AREA NEED CUT PLASTIC BE FREE OF SINK MARK

Suggestion (others) THIS AREA NEED CUT PLASTIC BE FREE OF SINK MARK

Suggestion(others) THIS AREANEED CUT PLASTIC BE FREE OF SINK MARK

Suggestion (others) THIS AREA NEED CUT PLASTIC BE FREE OF SINK MARK

Suggestion(others) THIS AREA NEED CUT PLASTIC BE FREE OF SINK MARK

Suggestion (others) THIS AREA NEED CUT PLASTIC BE FREE OF SINK MARK

点击下载完整版文档(PPT)VIP每日下载上限内不扣除下载券和下载次数;
按次数下载不扣除下载券;
24小时内重复下载只扣除一次;
顺序:VIP每日次数-->可用次数-->下载券;
共16页,试读已结束,阅读完整版请下载
相关文档

关于我们|帮助中心|下载说明|相关软件|意见反馈|联系我们

Copyright © 2008-现在 cucdc.com 高等教育资讯网 版权所有