点击切换搜索课件文库搜索结果(6756)
文档格式:DOC 文档大小:43KB 文档页数:3
Those who have attained some familiarity with computer operation and application have subsequently learned hat they must continually keep abreast of developments or rapidly fall behind, not only in regard to programming skills but most naval architects have properly decided
文档格式:DOC 文档大小:51.5KB 文档页数:4
Oceanographic submersibles are small research vessels for underwater transport of people and equipment and for use as underwater platforms for observation, sampling, measurement, and performing various work tasks. They are also referred to as undersea vehicles
文档格式:DOC 文档大小:464.5KB 文档页数:5
The underwater search has been made possible only by vast improvements in offshore technology. Drillers first took to the sea with land rigs mounted on barges towed to location and anchored or with fixed platforms accomp
文档格式:DOC 文档大小:44.5KB 文档页数:3
A naval architect asked to design a ship may receive his instructions in a form ranging from such simple requ ents as \an oil tanker to carry 100 000 tons deadweight at 15 knot nots\to a fully detailed specification of precisely planned requirements. He is usually required to prepare design for a vessel that must carry certain
文档格式:DOC 文档大小:139.5KB 文档页数:6
Marine engine is an engine that propels a water-born vessel. Even in small craft the marine engine must have the following characteristics: reliability, light weight, compactness fuel economy, low maintenance, long life, relative simplicity for operating personnel, ability to reverse, and ability to operate steadily at low or cruising speed. The relative importance of these
文档格式:DOC 文档大小:41KB 文档页数:3
Launching Apart from certain small craft built on inland waterways, which are launched sideways, the great majority of ships are launched stern first from the building berth. Standing structurc called ways, constructed of concrete and wooden blocks, spaced about one-third of the vessel's
文档格式:DOC 文档大小:40KB 文档页数:3
Planning Delivery of a completed ship by a specified date requires careful planning. Following the introduction of the critical path method of planning and control by the U. S. E. I. du Pont de Nemours Company' about 1959, new techniques were adopted in many shipyards
文档格式:DOC 文档大小:62.5KB 文档页数:6
A cargo shipper and the underwriter requested to insure a maritime risk requie some assurance that any particular vessel is structurally fit to undertake a proposed voyage.TO enable the shipper and underwriter to distinguish the good risk from the bad2a system of classification
文档格式:DOC 文档大小:49KB 文档页数:4
Components The strength deck, bottom, and side shell of a ship act as a box girder in resisting bending and other loads imposed on the structure. The main deck, bottom, and side shell also form a tight envelope to withstand the sea locally. The remaining structure contributes either directly to these
文档格式:PPT 文档大小:1.37MB 文档页数:28
set off, set out这两个短语动词都有“出发”和“动身”的意思 ,都可以解释为 start to move或 begin journey. 然而 set off的原义是使爆炸(cause to explode) set out的原义是着手做(begin work with the intention of achieving a particular aim). 注: set out在用来表示“着手做”(begin with definite purpose) 时,后面总是跟动词不定式
首页上页663664665666667668669670下页末页
热门关键字
搜索一下,找到相关课件或文库资源 6756 个  
©2008-现在 cucdc.com 高等教育资讯网 版权所有