当前位置:高等教育资讯网  >  中国高校课件下载中心  >  大学文库  >  浏览文档

同济大学:《地下工程》课程电子教案(讲稿)07 Operation Systems in Underground Engineering

资源类别:文库,文档格式:PDF,文档页数:25,文件大小:2.01MB,团购合买
1. Introduction 2. Installations for Traffic Control 3. Installations for Telecommunication 4. Ventilation 5. Illumination of Road Tunnels 6. Drainage 7. Example for the Equipment of Modern Road Tunnels
点击下载完整版文档(PDF)

CONTENTS 1.Introduction 2.Installations for Traffic Control 3.Installations for Telecommunication 4.Ventilation 5.Illumination of Road Tunnels 6.Drainage 7.Example for the Equipment of Modern Road Tunnels 百年同海2 TONGILUNIVERSITY

2 1. Introduction 2. Installations for Traffic Control 3. Installations for Telecommunication 4. Ventilation 5. Illumination of Road Tunnels 6. Drainage 7. Example for the Equipment of Modern Road Tunnels CONTENTS

1.Introduction Plabutsch western tube (road tunnel) Cost in m Euro Planning,controlling 11.0 Main construction 91.0 Geotechnical measurements 2.3 Electrical equipment 18.0 Ventilation 5.8 Water supply for fire fighting 1.0 百年同海3

3 1. Introduction Plabutsch western tube (road tunnel) Cost in m Euro Planning, controlling 11.0 Main construction 91.0 Geotechnical measurements 2.3 Electrical equipment 18.0 Ventilation 5.8 Water supply for fire fighting 1.0

2.Installations for Traffic Control Installations for Traffic Control comprise .. 百年同濟 4 TONGILUNIVERSITY

4 2. Installations for Traffic Control Installations for Traffic Control comprise …

2.Installations for Traffic Control Vehicles Communications Yards and Shops Control Center Systems Integration Train Control Fare Stations Equipment Tunnels 0&M 百年同濟5

5 Systems Integration Yards and Shops Vehicles Communications Control Center Train Control Fare Equipment Tunnels O&M Stations 2. Installations for Traffic Control

2.Installations for Traffic Control 个Exit oA8丽 Platform of Station:Many Systems will be Integrated Here! 百年同濟6 TONGILUNIVERSITY

6 Platform of Station: Many Systems will be Integrated Here! 2. Installations for Traffic Control

2.Installations for Traffic Control 1)Road signs/train information Current Sign System Information Flow The Train Dispatchers notice delays and originate Passenger Information Train Control System Train Dispatcher 2-way voice radio 72 Sign Dispatcher (at CROCC and CTEC) AMTRAK T1 Needham Sonet Line T1 百年同濟7 Penta Signs PDS Signs TAMS Signs TONGII UNIVERSITY

7 2. Installations for Traffic Control 1) Road signs/train information Sign Dispatcher (at CROCC and CTEC) GEOFOCUS Dispatch PC Train Dispatcher The Train Dispatchers notice delays and originate Passenger Information 2-way voice radio Train Location Display Radio Penta Signs PDS Signs TAMS Signs AMTRAK Sonet Needham Line T1 Cingular Wireless T1 Train Control System Current Sign System Information Flow

2.Installations for Traffic Control 2)Traffic lights in tunnels with emergency call provisions 3)Traffic guide equipment 4)Traffic census 5)Height control to catch over-sized vehicles 6)Video-monitoring 7)Modern sensors provide warnings to make traffic slow down 百年同濟 8 TONGILUNIVERSITY

8 2. Installations for Traffic Control 2) Traffic lights in tunnels with emergency call provisions 3) Traffic guide equipment 4) Traffic census 5) Height control to catch over-sized vehicles 6) Video-monitoring 7) Modern sensors provide warnings to make traffic slow down

2.Installations for Traffic Control Incident Detection not The Train Dispatchers notice delays and originate Passenger Automatic Information Train Contro System Train Dispatch oice radio Incident Reporting not Auto避ic,Multiple 2-wa Dispatchers Sign Dispatche (at CRQCC and Incident Reporting CTEC) not Automatic AMTRAK T1 Needham Wireless Penta Signs PDS Signs TAMS Sig:is Maintenance and coverage issues Typical System Issues 百年同海9 TONGII UNIVERSITY

9 2. Installations for Traffic Control Sign Dispatcher (at CROCC and CTEC) GEOFOCUS Dispatch PC Train Dispatcher The Train Dispatchers notice delays and originate Passenger Information 2-way voice radio Train Location Display Radio Penta Signs PDS Signs TAMS Signs AMTRAK Sonet Needham Line T1 Cingular Wireless T1 Train Control System Incident Detection not Automatic Incident Reporting not Automatic, Multiple Dispatchers Maintenance and coverage issues Incident Reporting not Automatic Typical System Issues

3.Installations for Telecommunication PROFITEL IP 1)Equipment for emergency calls 可四E 四回 FOE 2)Service telephones 3)Radio communication Profitek 4)CCTV 5)Emergency signalization 百年同濟10 TONGILUNIVERSITY

10 3. Installations for Telecommunication 1) Equipment for emergency calls 2) Service telephones 3) Radio communication 4) CCTV 5) Emergency signalization

4.Ventilation 1)Ventilation during construction Aims? 百年同热0

11 11 /40 4. Ventilation 1) Ventilation during construction Aims?

点击下载完整版文档(PDF)VIP每日下载上限内不扣除下载券和下载次数;
按次数下载不扣除下载券;
24小时内重复下载只扣除一次;
顺序:VIP每日次数-->可用次数-->下载券;
共25页,试读已结束,阅读完整版请下载
相关文档

关于我们|帮助中心|下载说明|相关软件|意见反馈|联系我们

Copyright © 2008-现在 cucdc.com 高等教育资讯网 版权所有